GB
F
Installation and operating instructions
LV100
Standard
LV100PC Pull Cord
D
LV100T
LV100H
Time
r
NL
I
Humidistat
LV100HP Humidistat and Pull Cord
S
LV100PIR Integral Body Movement Sensor
GR
N
Safety extra low voltage toilet/bathroom
100mm fan range
Retain for future reference
SE
A
®
H
J
LV100, LV100PC, LV100H,
LV100HP & LV100PIR
LV100, LV100PC, LV100H,
LV100HP & LV100PIR
LV100T
LV100T
I
K
LV100H & LV100HP
L
M
LV100PIR
3
Installing the fan
What the installer will need
GB
These appliances are intended for connection to
fixed wiring.
A double pole isolating switch with a minimum
contact gap of 3mm (Wall or Ceiling mounted).
Xpelair
Toilet/Bathroom
Fans LV100,
LV100PC, LV100T,
LV100H, LV100HP &
LV100PIR
installation &
operating
Check that the electrical rating shown on the
transformer matches the mains supply.
If metal switch boxes are used, earthing
regulations must be followed.
THESE APPLIANCES ARE DOUBLE
INSULATED AND DO NOT REQUIRE AN
EARTH CONNECTION.
Suitably rated 2-core cable (wiring from
transformer to fan).
Guidelines for maximum cable run between
the transformer and fan.
All installations must be supervised by a
qualified electrician.
a) Limited to 0.3 volts drop. corresponding to
1.5% reduction in fan performance.
Installations and wiring must conform to
current IEE Regulations (UK), local or
appropriate regulations (other countries).
Flexible
Fixed
Conductor size mm2 0.75 1.00
1.50 2.50
9.00 15.00
instructions
If you have any queries before installing these
products or after they have been installed, call
the Xpelair Technical Hotline +44(0) 8709
000430. Our Engineers are there to help you
during normal office hours (UK only) and may be
faxed at all other times +44(0) 8709 000530.
Recommended max 4.50 6.00
cable run-metres.
Please leave this leaflet
with the fan for the
benefit of the user
b) Limited to 0.5 volts drop, corresponding to 3%
reduction in fan performance.
Flexible
Fixed
Customers outside the UK may contact your
local Xpelair distributor.
Conductor size mm2 0.75 1.00
1.50 2.50
Recommended max. 7.50 10.00 15.00 25.00
cable run-metres.
Description
All fans
Suitably rated 2 core cable (supply to
transformer) LV100, LV100PC, LV100H,
LV100HP, LV100PIR.
•
Universal mounting kit allows
•
Window/Wall/Panel/Ventilation Shaft/Ceiling
mounting options. See termination details. If
Ceiling mounting the fan, see section ‘What
the installer will need’.
Suitably rated 3 core cable (supply to
transformer LV100T only.
•
3mm Electricians Screwdriver and No.1 or 2
Pozidriv screwdrivers.
•
Single speed extraction.
•
12V a.c. operation.
To prevent a possible hazardous situation
•
•
from water ingress, a condensation trap
(Xpelair No. XCT100) must be fitted as
close as possible to the fan in all
situations where any section of the
ductwork is positioned higher than the fan
itself.
LV100
Operate the fan using an on/off switch
(not supplied).
•
LV100PC
Operate the fan using the integral pull cord.
•
If wall mounting the fan, you will also need
LV100T
Masonry drill, Hammer & Chisel (or Core Drill
equipment if available).
•
Built-in timer automatically operates fan for a
preset delay of up to 25 minutes.
•
Mortar to make good the hole if required.
•
LV100H
If window mounting the fan
Operates when triggered automatically by the
humidity sensor.
•
You will need a window pane between 3mm
and 6mm thick (preferably 4mm).
•
Built-in timer automatically operates fan for a
•
preset delay of 2 to 20 minutes once humidity
drops below preset Relative Humidity (RH)
value.
Do not install in glass 3mm thick if the window
pane area is more than 0.2 sq.m.
•
If installing in sealed double glazing, a
•
LV100HP
specially manufactured unit should be
obtained from the glazing manufacturer. You
will also require a special kit, Xpelair Cat. ref.
DXDG.
Operates either when triggered automatically
•
by the humidity sensor or when turned on
using the integral pull cord switch (light
indicates when fan is operating in manual
mode).
If installing in sash windows, you should
•
mount the fan in the upper window. Secure the
upper sash in the closed position and fit stops
just below the level of the fan, to prevent
damaging it when the sash is raised.
LV100PIR
An integral body movement sensor operates
•
the fan as long as movement is detected.
Built-in timer automatically operates fan for a
preset delay of 2 to 20 minutes.
If installing in a panel which is between 9mm
•
and 46mm thick, you will need a special kit,
Xpelair Cat. ref. DXDG. Do not install these
fans in panel which is more than 46mm thick.
Transformer
Wall mounted out of reach of bath or shower.
Provides safety insulated supply for 12V a.c.
•
•
fan.
4
If ceiling mounting the fan
2. Check there are no buried pipes or cables
e.g. electricity, gas, water behind the
switch location (in the wall or above the
ceiling).
Use the appropriate ancillaries for termination.
These items are available from Xpelair.
1. WT10 - Termination ducting kit.
If in doubt, seek professional advice.
2. CFWG100 - Soffit board termination grille
(white or grey).
3. FD100/3 and FD100/6 - flexible ducting.
3. Isolate the mains supply.
4. Lay in the cable from the supply to the double
pole isolating switch.
Where to locate it
5. Lay in the cable from the isolating switch to the
transformer location.
Fan
6. Lay in the cable from the transformer to the fan
location.
Locate it as high as possible.
•
At least 110mm from the edges of the
mounting surface to the centre of the hole.
•
7. Install the isolating switch.
8. Make all connections within the isolating
switch.
As far away as possible from and opposite to
•
the main source of air replacement to ensure
airflow across the room (e.g. opposite the
internal doorway).
Note: On/off switch must be so situated that
it cannot be touched by persons making use
of the bath or shower.
WARNING: DO NOT MAKE ANY
CONNECTIONS TO THE ELECTRICAL
SUPPLY AT THIS STAGE.
Near the source of steam or odours.
•
Not where ambient temperatures are likely
to exceed 50˚C.
•
If installed in a kitchen fans must not be
mounted immediately above a cooker hob,
or eye level grill.
•
Preparing the hole for the fan
If working above Ground Floor level,
appropriate safety precautions must be
observed.
WARNING: EYE PROTECTION MUST BE
WORN DURING ALL DRILLING AND
CHISELLING OPERATIONS.
If installing in a room containing a fuel
•
burning device which has a non-balanced
flue, it is the installers responsibility to
ensure that there is enough replacement air
to prevent fumes being drawn down the
flue when the fan is operating up to
maximum extract. Refer to Building
If installing in a wall
1. Check there are no buried pipes or cables
in the wall or obstructions on the outside
e.g. Electricity, Gas, Water.
Regulations for specific requirements.
Exhaust air must not be discharged into a
•
If in doubt, seek professional advice.
flue used for exhausting of fumes from
appliances supplied with energy other than
electric. Requirements of all authorities
concerned must be observed for exhaust
air discharge and intake flow rates.
2. Mark on the wall the centre of the duct hole.
3. Use this centre to mark a circle to suit the wall
duct (115mm diameter)
If core drill equipment is available
When intended for use in possible
•
4a.Use as directed by Core Drill manufacturer.
If core drill equipment is not available
4b.Drill a centre hole right through the wall.
chemical corrosive atmospheres, consult
our Technical Service Department.
(For overseas markets contact your local
Xpelair distributor).
5. Cut the hole. Do not cut right through the wall,
cut from both sides. (The recommended
method is to drill a series of holes, close
together, around the edge of the cutting line
and remove the brick between the holes with a
chisel).
LV100PIR Only - Siting must ensure
•
detection of movement. Care should be
taken to avoid any obstructions that may
affect detection beams A .
Transformer
6. Go outside and cut a hole in the outer wall,
repeating the process described above.
In a loft or any convenient position on a wall
•
(not suitable for ceiling mounting).
The transformer must not be covered by
loft insulation.
7. Cut ducting to the correct length if required.
The wall tube supplied is telescopic and can
extend to 300mm maximum.
Must be positioned the correct way up to fulfil
ingress protection requirements.
•
8. Fit the ducting. Ensure that the duct slopes
down away from the fan to allow drainage of
any incoming rain water to the outside.
Not within 0.6m of a bath or shower cubicle, up
to a height of 2.25m.
•
9. Make good the hole. Allows the Mortar to set
before continuing the fan installation.
Not where ambient temperatures are likely
to exceed 50˚C.
•
If installing in a window or panel
Installing the isolating switch and cables
Cut a hole, 125mm in diameter. The centre of the
hole should be at least 110mm away from the
edge of the panel or pane of glass. It is
recommended that you obtain a ready cut pane
for window installation.
1. Check that the electrical rating shown inside
the back plate matches your mains supply.
5
If installing in a ventilation shaft
Mount the back draught shutter
GB
1. Check there are no buried pipes or cables
in the ventilation shaft.
If in doubt, seek professional advice.
1. Peel the backing from the foam strip supplied
and attach it around the outside of the lip on
the back draught shutter.
Xpelair
2. Cut a hole 110mm in diameter, in the side of
the shaft.
Toilet/Bathroom
Fans LV100,
LV100PC, LV100T,
LV100H, LV100HP &
LV100PIR
installation &
operating
instructions
2. Go outside. Holding open the top and bottom
vanes, insert the lip into the wall duct.
3. If the shaft has cavity walls, use the wall tube
to bridge the cavity.
3. Making sure the back draught shutter is level,
mark the positions of the two fixing holes in
the top right hand and bottom left hand
corners.
4. Fit ducting and condensation trap if
necessary, positioning condensation trap as
near to the fan as possible.
4. Remove the back draught shutters from the
wall duct.
If installing in a ceiling
5. Drill screw holes in these positions, and fit the
remaining wall plugs.
1 Check there are no buried pipes or cables
in the ceiling joists etc.
Please leave this leaflet
with the fan for the
benefit of the user
If in doubt, seek professional advice.
6. Holding open the top and bottom vanes, refit
the back draught shutter and fasten it to the
wall using the pointed end self-tapping
screws. Do not overtighten screws.
2 Cut a hole 115mm diameter.
Preparing the fan for installation
Remove the front cover by pressing the release
catches located on the sides of the unit with a
3mm screwdriver, whilst pulling the front cover
forward M
7. Make sure the vanes open and shut freely.
If installing in a window or panel
Sealing the hole E
Mount the fan in the hole
If installing in a window or panel no more than
9mm thick, fit the white rubber gasket around the
edge of the hole. If installing in a panel or sealed
double glazing more than 9mm thick, a DXG
Double Glazing kit is required. Follow the
instructions supplied with the special kit.
If working above Ground Floor Level,
appropriate safety precautions must be
observed.
If installing in a wall, ceiling or vent
Mark the position of the back plate B
Attach the back draught shutter to the spacer F
1. Hold the back plate so that the terminal block
faces you in the left hand corner, and the lip
points towards the hole.
1. Holding open the top and bottom vanes,
insert the back draught shutter 2 into the
spacer 3 so that the fixing holes in the top
right and bottom left hand corners match
those on the spacer.
2. Carefully insert the lip into the wall
duct/ceiling or vent shaft.
3. Adjust the position of the back plate until it is
level.
2. Insert two of the flat ended self-tapping
screws provided and fasten the back draught
shutter to the spacer.
4. Mark on the wall/ceiling or vent shaft the
positions of the three fixing holes in the back
plate.
Mount the fan in the window G
1. Someone else must hold the back draught
shutter and spacer in position outside, with
the spacer against the glass.
5. Remove the back plate from the ducting.
6. Drill screw holes in these positions if
necessary, and fit wall plugs if necessary.
2. Make sure that the two raised fixing holes in
the spacer are horizontal and are positioned
within the hole.
Mount the back plate C
1. Push the ribbed gasket (RG100) onto the lip
of the back plate 1
3. From inside, hold back plate so that the
terminal block faces you in the top left hand
and the lip points towards the hole.
2. If installing in a ceiling or vent, push the
larger diameter piece of the telescopic wall
tube onto the ribbed gasket. Cut the tube to
the required length, if necessary.
4. Align the holes in the back plate with those in
the spacer.
5. Insert two of the flat ended self-tapping
screws provided in the fixing holes, and
fasten the back plate to the spacer. Do not
overtighten the screws.
3. If wiring the fan from behind, remove
knockout. Feed the mains cable through the
cable entry hole in the backplate to the
terminals D
Mounting the transformer I
4. If wiring from above, leave the cable free to
be fitted into labyrinth.
The transformer can be fixed directly to the wall
or attached to a suitable recessed wall box.
5. Insert the lip of the back plate into the wall
duct/ceiling or vent shaft as before.
If fixing directly
1. Remove two screws securing the cover,
remove cover.
6. Fasten the back plate to the wall/ceiling or
vent shaft using appropriate fasteners. If
using screws, do not overtighten the
screws.
2. Position the transformer on the wall and mark
the two fixing holes “A” and “C”.
6
3. Drill and plug the two holes and fix the
transformer with two pointed end self-tapping
screws supplied.
2. Locate the cables in the cable grips (mains
cable shown in H , and make the
connections shown in J ).
3. Ensure all connections are tight.
If fitting to a recessed wall box
4. Switch off the mains electrical supply and
remove fuses.
1. Route the cables into the wall box and fix the
wall box to the wall.
5. Connect the cable from the isolating switch to
the electrical supply wiring.
2. Connect the protective earth conductor if
required.
For fixed wiring circuits the protective
3. Remove the two round knock-outs in the back
of the transformer and route the 12v a.c.
mains supply cables into their respective
compartments.
•
fuse for the appliance must not exceed 5A.
6. Refit fuses and switch on supply.
Using your fan
4. Fix the transformer to the wall by inserting the
two screws provided through holes “A” and “C”
and securing to the lugs on the wall box.
LV100 only
Operate the fan using on/off switch (not
supplied). Repeat to switch off.
•
For loft mounting, the transformer can be
fixed to a wooded surface with the two
screws.
•
LV100PC only
Operate the fan by pulling and releasing the
integral pull cord.
•
THE TRANSFORMER MUST NOT BE
COVERED BY LOFT INSTALLATION.
•
Repeat to switch off.
•
Wire the fan H
LV100T only
MAKE SURE THE MAINS SUPPLY IS
ISOLATED.
Operate the fan using the on/off switch. When
the switch is turned off, the fan continues to
operate for the adjustable time delay period.
•
Wire the fan as shown in H . Feeding the cable
between the two raised pegs, if wiring from above
and through the labrynth to the terminal block.
LV100H only
Fan operates when relative humidity exceeds
•
For fixed wire and circuits the protective
fuse for the appliance must not exceed 5A.
the set level. When relative humidity drops the
fan continues to operate for the adjustable
time delay.
•
LV100T only
LV100HP only
To adjust the overrun timer insert a small
•
screwdriver into the recess in the control
spindle and turn clockwise to increase and
anti-clockwise to decrease.
Manual mode: use the integral pull cord
•
switch. When you switch off the fan, it goes
into automatic mode after the time delay.
(Light indicates when fan is operating in
manual mode.
LV100H & LV100HP only
K
Humidity operation is factory set at approx
70% Relative Humidity (RH), but can be
adjusted between 50% and 90% RH by
control (H).
•
LV100PIR only
The sensor detects movement in the room
•
and activates the fan. When movement is
sensed, the fan will run for a pre-set overrun
period and any further movement sensed will
re-start the sequence. This ensures that the
room is only ventilated during and
Time delay is factory set at approx. 20 mins,
but can be adjusted by control (T).
•
•
Both controls are adjustable. Turn the controls
clockwise to increase time or RH, and anti
clockwise to decrease.
immediately after use. When the fan is first
installed there will be a stabilising period of
approximately five minutes. During this time
the fan will run for up to two minutes.
LV100PIR only L
Adjust the overrun period with control (T).
Turn screwdriver clockwise to increase and
anti-clockwise to decrease.
•
Cleaning (recommended once a month)
A QUALIFIED ELECTRICIAN SHOULD CARRY
OUT ALL CLEANING
1. Before cleaning isolate the fan completely
from the mains supply.
2. Remove the front cover by pressing the
release catches located on the sides of the unit
with a 3mm screwdriver whilst pulling the front
cover forward M
3. To clean the front cover either wipe it with a
damp, lint free cloth or wash it in warm soapy
water. Thoroughly dry the front cover and re-fit.
All fans
If wiring from above cut out the cable entry
slot marked on top of the front cover.
•
Fit the front cover by aligning it square to the
•
duct and pushing it onto the duct until the
release catches snap into the slots on the
front cover.
Wiring the transformer H & J
MAKE SURE THE MAINS SUPPLY IS
ISOLATED.
4. Do not immerse the fan in water or other
liquids to clean any other parts of the fan.
1. If surface mounting, route 12V a.c. mains
supply cable through the appropriate knock-
outs into their respective compartments.
5. Never use strong solvents to clean the fan.
6. Apart from cleaning, no other maintenance is
required.
7
Notes
LV100, LV100PC,
LV100T, LV100H,
LV100HP,
LV100PIR
54
55
Do's and dont's
•
•
•
Do read all the instruction leaflet before commencing installation.
Do install each fan with a double pole isolating switch.
Do make sure the mains supply is switched off before attempting to make electrical
connections or carry out any maintenance or cleaning
•
Don't install this fan in any window/panel which is less than 4mm thick.
Guarantee
Customers outside UK - see international below.
•
•
•
UK: The fan is guaranteed against defects for 3 years from the date of purchase.
Please keep your purchase receipt.
If you have any problems, contact Xpelair's Head Office at the address shown below.
Technical advice and service
Customers outside UK - see international below.
UK: Xpelair have a comprehensive range of services including:
Free technical advice help-desk from Engineers on all aspects of ventilation.
Free design service, quotations and site surveys.
•
•
•
Service and maintenance contracts to suit all requirements.
Please ask for details:
•
•
•
By telephone on Techline: +44 (0) 8709 000430
By fax on Techfax:
+44 (0) 8709 000530
At the address below
Head Office, UK Sales Office and Spares
Applied Energy Products Ltd, Morley Way, Peterborough, PE2 9JJ England
Telephone:
Fax:
Sales Hotline:
+44 (0) 1733 456789
+44 (0) 1733 310606
+44 (0) 8709 000420
International
•
•
Guarantee: Contact your local distributor or Xpelair direct for details.
Technical Advice and Service: Contact your local Xpelair distributor.
Part No. 567 2027 01
(Revision B)
|